Click here to make tpub.com your Home Page

Page Title: FINAL INSPECTION/TEST.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6350-275-24&P
3-135. FINAL INSPECTION/TEST.
a. General. This section provides final inspection and test procedures to ensure the ICIDS system is functioning
after repair. After satisfactory completion of these inspections/tests, the ICIDS should be functional.
b. Final Inspection.
(1) Check that the power switches on the processing units, monitors, power supplies, and sensor units operate
smoothly.
(2) Check that the circuit breakers on the power supplies operate correctly.
(3) Check cabling for cracked or broken insulation.
(4) Check that all hardware is securely fastened.
(5) Ensure that individual assembly covers are fastened.
c. Final Test.
(1) Perform operational checkout procedures as described in TM 5-6350-275-10, paragraphs 2-7 through 2-9.
(2) Upon satisfactory completion of final test, the ICIDS will be functional.
3-250

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business