Click here to make tpub.com your Home Page

Page Title: REPLACE OPERATOR WORKSTATION, B38 CPU
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6350-275-24&P
(1) Press printer power switch (10) to off position.
(2) Remove serial interface cable (6) from B39 CPU connector (3) and Event Printer serial connector (9) by
loosening two screws on each end of serial interface cable connector.
(3) Gently pull serial interface cable connectors from B39 CPU connector (3) and printer serial I/O card connector
(9).
b.
Installation
(1)
Gently push serial interface cable connectors onto B39 CPU connector (3) and printer serial i/o card
connector (9) and tighten down with two screws on each cable connector.
(2)
Press printer power switch (10) to on position.
3-19. REPLACE OPERATOR WORKSTATION, B38 CPU. (Figure 3-30).
This task consists of:
a. Remove
b. Install
INITIAL SETUP:
Tools:
General Safety Instructions:
Screwdriver, Flat tip (Item 6, App B)
Remove all jewelry while working on
Materials/Parts:
equipment.
B38 CPU
WARNING
Shut off power source before attempting to disconnect, service, or connect wires or cables. Failure to do
so may result in serious injury or death.
a.
Removal
(1) Press power switch (1) in to remove power from B38 CPU (2). Disconnect ac power cord (5) from power module
(7), and DC power cord (6) from B38 CPU (2).
(2) Remove B38 CPU side cover (3) and disconnect color monitor cable (8) from video connector on panel (4).
(3) Remove printer serial interface cable (9) from RS232A connector on panel (4) and cluster cable (11) from cluster
connector on panel (4).
b.
Installation
(1) Install side cover (3) from B38 CPU (2).
(2) Connect printer serial interface cable (9) to RS232A connector on panel (4) and cluster cable (11) to cluster
connector jack on panel (4).
(3) Connect color monitor cable (8) to video connector jack on panel (4).
(4) Connect power module, DC power cord (6) to B38 CPU (2) and ac power cord (5) to power module.
(5) Press B38 CPU power switch (1) on to apply power to B38 CPU.
3-90

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business