Click here to make tpub.com your Home Page

Page Title: Table 2-15. Preventive Maintenance Checks and Services for the ICIDS - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6350-275-10
Table 2-15. Preventive Maintenance Checks and Services for the ICIDS - Continued
Item
Interval
Location
Procedures
Not Fully Mission
No.
Check/Service
Capable If:
13
Weekly
Power supply, PS
Inspect power supply for air flow and
Air flow is
ventilation. Remove materials that may
restricted and
be blocking the power supply.
causes
overheating
14
Weekly
Power cable AC
Inspect cable for fraying or cuts in
Frayed wiring or
insulation.
cuts in insulation
15
Weekly
Power cable DC
Inspect cable for fraying or cuts in
Frayed wiring or
insulation.
cuts in insulation
16
Weekly
CCTV
a. Inspect CCTV equipment for missing
Cables are loose
hardware, loose cables, or obvious signs
or disconnected
of damage.
b. Test the CCTV system by changing
You cannot
the monitor scenes per paragraph 2-17.
display a scene
on command
17
Weekly
CCTV monitor
a. Inspect the monitor cables for fraying,
Frayed wiring or
cuts in the insulation, and loose cable
cuts in insulation;
connectors.
loose cable
connectors
b. Service the CCTV monitor by cleaning
the screen with terminal screen cleaner,
Item No. 1, Appendix D. Wipe using a
lintless cloth, Item No. 2, Appendix D.
2-24

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business