Click here to make tpub.com your Home Page

Page Title: Table 5-1. Troubleshooting Procedures - Continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-6350-264-14&P-11
NAVELEX EE 181-AA-OMI-120/E121 C-7359-40-1
T.O. 31S9-2FSS9-1-11
Table 5-1. Troubleshooting Procedures - Continued
Trouble
Probable cause
Corrective Action
9.
(Cont)
c.
(Cont)
(6)
To remove switch S1 from
power supply, tag, identi-
fy, and disconnect wires
on switch S1. Remove nut
securing switch to chassis
and remove switch.
(7)
To install new switch posi-
tion switch and secure with
nut. Connect wires on
switch terminals. Install
cover and secure with
screws.
(8)
To install one-zone Monitor
Cabinet power supply,
position power supply in
cabinet and install nuts on
captive screws. Connect all
interconnecting wires to
TB1, TB2, and TB3. Posi-
tion terminal board cover
on TB1 and install mount-
ing screws and lock
washers. Position batteries
in cabinet and connect ter-
minal leads. Position
Status Monitor Module in
mounting rack (ensure that
connector is properly en-
gaged) and install mount-
ing screws. Turn on exter-
nal ac power by turning on
circuit breaker. Close and
latch mounting rack. Close
and lock cabinet door.
b.
Replace five-zone Monitor Cabinet
power supply or switch S1.
(1)
To remove five-zone Monitor
Cabinet power supply, un-
lock and open cabinet door.
Unlatch and swing out
mounting rack. Discon-
nect battery terminal leads
5-12

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business