Click here to make tpub.com your Home Page

Page Title: High Voltage Cabinet
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

by feel (with operating handle) that switch operates
side of trailer. Remove a 3 / 4 inch diameter by 10 foot
long grounding rod from the deck. Drive grounding rod
correctly.  If switch operates hard or contacts are
misaligned, see paragraph 3-10. When switch operates
into the ground approximately 8 foot. Clamp the No. I
ground wire to the grounding rod.
normally, switch it to the open position.  Make sure
switch position indicator (2) reads open, and observe by
sight that switch is open. Remove operating handle and
b.
High Voltage Cabinet .Unlock and remove bar
return it to storage cabinet. Open upper and lower front
(4, fig. 2-1) covering load break switch operating handle
panels and make a visible check to see that all
switch socket (3). Remove switch handle from storage
connections are tight.
cabinet, insert it into socket and operate switch a few
times: Observe through switch inspection window (I and
2-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business