Click here to make tpub.com your Home Page

Page Title: Installing Second Deck Section
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5430-209-12
e. Installing Second Deck Section.
(3) Raise second section in accordance with d.
above. Place left lap seam over the bolts in right lap
(1) Face small end of the section. Install
seam of first section (3, fig. 8-53). Position large end of
second section and all remaining sections to the. left of
section over proper bolts in top chime of third ring
first section, or in a counterclockwise direction around
staves.
the tank.
(2) Face large end of section and move gin pole
(2, fig. 8-52) to the right, to the next vertical beam.
Install per instructions in b above
Figure 8-53. Installing deck sections.
f. Installing Intermediate Deck Sections. There are
(4) Install small end of second section (1)
following procedures in d (7) and (8) above.
34 intermediate deck sections. Those made up with
(5) Install nuts on 10 equally spaced bolts (2.fig.
special plates (fig. 8-54) are installed to meet field
8-481 in lap seam (2, fig. 8-53). Install finger tightened
conditions.
nuts on all chime bolts except the bolt in the right lap
seam of second section.
8-33

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business