Click here to make tpub.com your Home Page

Page Title: Figure 3-11. Installing first stave
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5430-209-12
(c) Install a wedge gasket (3) in the space by the lap
underneath gasket (5) of vertical seam at bottom and
offset at the vertical seam, and a radii gasket (4)
top chimes of stave.
1.
FIRST STAVE
2.
BOLT
3.
WEDGE GASKET
4.
RADII GASKET
5.
STRIP GASKET
Figure 3-11. Installing first stave.
CAUTION
NOTE
Radii  gaskets  must  be  placed
Intermediate staves are installed in a
between chimes, and rubber gasket
counterclockwise direction around the
material at the seams, top and
bottom.
(a) Before positioning first intermediate
bottom, of all side sheets to insure a
stave (1. fig. 3-12), push two or three bolts flush with
leakproof connection.
the chime gasket to the right of the first stave.
(2) intermediate stave.
3-11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business