TM 5-5420-205-14
CHAPTER 4
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Section I. SERVICE UPON RECEIPT OF MATERIEL
lift the end bay superstructure from the carrier bed as
4-1. Unloading Equipment
illustrated in figure 4-3(3). Make sure that hooks are
a. End Bay Superstructure.
Attach the link
fully engaged on the I- beams before lifting (fig. 4-4).
assembly clamp as shown in figure 4-1 and 4-3(1). This
b. Interior Bay Superstructure. This unit is the
clamp holds the two sections of the end bay
same at each end. Slip the superstructure sling hooks
superstructure together for lifting.
Attach the
superstructure sling assembly (fig. 4-2) with each hook
plank from each end and lift the unit from the carrier
up against stop bolts on the end bay super- structure as
bed.
illustrated in figure 4-3(2). Attach a suitable lifting
device with a minimum capacity of 25,000 pounds and
Figure 4-1. Link assembly clamp in place.
4-1
|