Click here to make tpub.com your Home Page

Page Title: Chapter 4 ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-205-14
CHAPTER 4
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Section I. SERVICE UPON RECEIPT OF MATERIEL
lift the end bay superstructure from the carrier bed as
4-1. Unloading Equipment
illustrated in figure 4-3(3). Make sure that hooks are
a.  End Bay Superstructure.
Attach the link
fully engaged on the I- beams before lifting (fig. 4-4).
assembly clamp as shown in figure 4-1 and 4-3(1). This
b.  Interior Bay Superstructure.  This unit is the
clamp holds the two sections of the end bay
same at each end. Slip the superstructure sling hooks
superstructure  together  for  lifting.
Attach  the
(fig. 4-5) in place between the eighth and ninth deck
superstructure sling assembly (fig. 4-2) with each hook
plank from each end and lift the unit from the carrier
up against stop bolts on the end bay super- structure as
bed.
illustrated in figure 4-3(2).  Attach a suitable lifting
device with a minimum capacity of 25,000 pounds and
Figure 4-1. Link assembly clamp in place.
4-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business