TM 43-0156
Step
Function
Mech
Insp
2
(d) Wrap the arc chutes with PPP-C-843 cushioning.
cont
(e) Place arc chutes into the box.
(f) Isolate the arc chutes from the sides of the box
and each other by using MM-L-751 lumber (21 x 2 x
4) and seal the box.
(g) Mark box to indicate contents.
(h) Secure the relay covers with QQ-W-461 wire.
(i) Coat electrical contacts and terminals with
MIL-C-83360 coating compound.
(j) Secure circuit breaker control door with QQ-W-461 wire.
(k) Install protective blocking MM-L-751 lumber
(25-1/2 x 2 x 4) (17 x 2 x 4) (5-3/4 x 2 x 4)
inside the switch gear cubicle between the relay
panel and exterior access door.
(l) Remove plastic vents from doors. Put screws back
into holes.
(m) Wrap vents in PPP-C-843 cushioning and place into
a PPP-B-636 fiberboard box (12 x 8 x 6). Seal box
lid with PPP-T-76 tape.
(n) Secure box inside cabinet with MIL-T-22085 tape.
PPP-T-60, type 4, 4-inch wide tape, may be used
as a substitute.
(o) Secure the door handles with a positive locking device.
(p) Seal openings with MIL-T-22085 tape. PPP-T-60
tape may be used as a substitute.
(2) Cable Reels. Place each cable reel--900-ft control
cable, 900-ft power cable, and 300-ft ground cable--
into a PPP-B-601 box fabricated in accordance with
B-3-15 for a list of materials. Mark box to
identify contents.
f. Marking.
(1) Mark boxes and units in accordance with appendix E.
(2) Mark four sides of the containers with 2-inch
minimum size letters to indicate "REUSABLE CONTAINER
- DO NOT DESTROY."