![]() TM 43-0156
Step
Function
Mech
Insp
2
(c) Secure bag to the inside of the control unit with
cont
MIL-T-22085 tape. PPP-T-60, type 4, 4-inch wide
tape may be used as a substitute.
(d) Cover louvers with MIL-B-131 barrier and NN-P-530
5/16-inch plywood (20 x 20) and secure with FF-B-
584 machine bolts (1/4 x 3 NC). NN-P-530, 3/8-
inch plywood may be used as a substitute.
(e) Seal edges with MIL-T-22085 tape. PPP-T-60 tape
may be used as a substitute.
(5)
Air Intake.
(a) Wrap filter with MIL-B-131 barrier, install and
lock metal door.
(b) Seal edges with MIL-T-22085 tape. PPP-T-60 tape
may be used as a substitute.
(6)
Batteries and Cables.
(a) Coat the battery cable connectors with MIL-S-8660
silicone. Wrap with MIL-B-121 barrier and secure
with PPP-T-60 tape.
(b) Secure cables to frame.
(c) Place 14 dry-charged batteries into battery rack.
Place NN-P-530 plywood shims (10-1/2 x 8-1/2)
between batteries to prevent movement.
(d) Install Jumper cables and coat battery posts with
MIL-S-8660 silicone.
(7)
Relay Room and Fuse Panel.
(a) Fuses.
1 Remove fuses from fuse panel and battery charger.
2 Wrap fuses with MIL-B-121 barrier and place in
MIL-B-117 plastic bags according to rating. Heat
seal bag. Mark bag to indicate contents.
3 Place bagged fuses in a PPP-B-636 fiberboard box
(12 x 12 x 12) and seal with PPP-T-76 tape. Mark
box to indicate contents.
4 Place box in the relay room and secure with MIL-T-
22085 tape. PPP-T-60 tape may be used as a substitute.
(b) Electrical Contacts. Coat electrical contacts and
terminals with MiL-C-83360 coating compound.