Click here to make tpub.com your Home Page

Page Title: Crankcase and Oil System.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 43-0156
Step
Function
Mech
Insp
2
7 Install fuel filters and seal chambers.
cont
8 Remove fuel gage float assembly. Preserve
assembly as follows:
(a) Wrap fuel gage assembly in MIL-B-121 barrier
and PPP-C-843 cushioning. Place fuel gage
assembly into a PPP-B-636 fiberboard box (18 x
6 x 4). Seal box with PPP-T-76 tape.
(b) Mark box to indicate contents.
(c) Secure box to fuel tank with MIL-T-22085 tape.
PPP-T-60, type 4, 4-inch wide tape, may be used
as a substitute.
CAUTION
Prelube unit before starting if unit has not been running during
the last 24 hours.
9 Ensure that there is only sufficient fuel (approx
30 gal) in the fuel tank to warm engine.
10 Start the engine on fuel and operate at fast idle
until thoroughly warm, then accelerate to
three-fourths speed. When the sight glass shows
foam, add VV-L-800 preservative oil to the fuel
tank.
11 Operate the engine until undiluted preservative
oil is observed flowing through the fuel return
sight glass.
12 Open drain valve and drain the preservative oil
from the fuel tank.
13 Close drain valve.
14 Atomize spray the interior of the fuel lank with
MIL-L-21260, type I, grade 30 preservative oil and
seal opening with MIL-T-22085 tape. PPP-T-60 tape
may be used as a substitute.
(c) Crankcase and Oil System.
NOTE
Allow sufficient time for engine to cool before processing oil
system.
Change 1
B-3-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business