TM 43-0156
Step
Function
Mech
Insp
3
(18) Warning Tag.
cont
(a) Prepare a tag (8135-00-292-2345) indicating "DE-
PROCESS ENGINE IN ACCORDANCE WITH DA FORM
2258 (Attached to this equipment) - IN ADDITION, THE
AIR CLEANERS, FILL PORTS, EXHAUST STACK,
BREATHER TUBES, AND FUEL TANK VENT HOLE HAVE
BEEN SEALED REMOVE SEALS PRIOR TO CRANKING
ENGINE."
(b) Secure the tag to the engine control panel.
b. Preservation of the Control Unit.
(1) Remove 21 arc chutes and phase barriers (2000 KW
only) from the circuit breakers. The arc chutes
will be packed separately (step 3c).
NOTE
The arc chutes are to remain installed in the 1500 KW during
shipment.
(2) Install phase barriers back onto breakers.
(3) Rack into place, block, and brace to prevent move-
ment.
(4) Pack fuses from each cabinet as follows:
(a) Wrap fuses with barrier (8135-00-226-3124) and
place in bags (8105-00-902-6508) according to
rating. Heat seal or staple bags.
(b) Place bagged fuses in a fiberboard box (8 x 12 x
3). Seal box with tape (7510-00-297-6655) and
mark to identify contents.
(c) Secure each box in cabinet with tape (7510-00-
916-9659). Tape 7510-00-890-9875 may be used
as a substitute.
(5) Coat electrical contacts and terminals with coating
compound (6850-00-003-5295).
(6) Remove relay covers and place barrier (8135-00-225-
3124) between disk and magnets. Set the protective
relay time dial settings to zero. Secure the relay
covers with wire (9505-00-222-3829).
Change 1
B-2-85
|