|
|
TM 43-0156
Step
Function
Mech
Insp
3
(3)
Wrap seal fuel transfer pump In MIL-B-121 barrier
cont.
and secure with PPP-T-60 tape.
(4)
Place each pump into a PPP-B-636 fiberboard box (21
x 8-1/2 x 11-1/4) and seal box with PPP-T-76 tape.
(5)
Place both boxes containing fuel transfer pumps into
a PPP-B-601 box (21-3/8 x 18 x 12) fabricated in ac-
cordance with appendix D-1. Refer to table B-2-16
for list of materials. Close and secure box lid.
g.
Packing for the Electrolyte (25 gal).
(1) Fabricate a PPP-B-601 box (56 x 29-3/4 x 21-1/2) in
accordance with appendix D-1. Refer to table B-2-17
for list of materials required.
(2) Fill bottom of box with 3 inches of HH-I-585 thermal
insulation.
(3) Place the five containers (5 gal) of electrolyte,
spaced 3 inches between each container on top of the
insulation.
(4) Fill void with HH-I-585 thermal insulation to the
level of the top edge of the wooden box.
(5) Close and secure box lid.
h.
CONSOLIDATED PACKING CRATE.
(1) Fabricate a MIL-C-104 crate (86-3/4 x 55-3/4 x
44-1/2) in accordance with appendix D-3. Refer to
materials.
(2) Place items on base in accordance with figure
B-2-10 or B-2-11.
(3) Secure with QQ-S-781 steel strapping, edge protec-
tors, and seals.
(4) Place crate top on base and secure with FF-W-92
washer and FF-B-561 lag bolts (1/2 x 4).
(5) Mark containers in accordance with appendix E and
mark all four sides of the container with 2-inch
minimum size letters to indicate "REUSABLE CON-
TAINER - DO NOT DESTROY."
B-2-57
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |