Step
Function
Mech
Insp
(10) Place PPP-C-843 cushioning over relays and switches
2
and secure with MIL-T-22085 tape. PPP-T-60 tape
cont
may be used as a substitute.
(11) Fabricate frame in accordance with figure B-2-2.
Refer to table B-2-2 for list of materials. Drill
holes to enable securing frame to control unit with
FF-B-584 bolts and FF-W-92 washers.
(12) Cover frame where it comes in contact with the control
unit with MIL-B-121 barrier.
(13) Secure frame to control unit with 3/9 x 5-1/2 NC
FF-B-584 bolts and FF-W-92 flat washers.
(14) Preserve and pack batteries as follows:
(a)
Fabricate a PPP-B-601 box (57-1/2 x 22-1/2 x 12)
for the batteries in accordance with appendix
D-1. Refer to table B-2-3 for list of materials.
Line box with MIL-B-121 barrier.
(b)
Coat battery posts with MIL-S-8660 silicone.
Place each battery into a PPP-B-636 fiberboard box
(10-3/4 x 10-3/4 x 9).
(c)
Place 10 dry-charged batteries into PPP-B-601 box.
(d)
Secure box to battery rack with QQ-S-781 steel
strapping, edge protectors, and seals.
d.
Arc Chutes (2000 KW).
(1) Fabricate PPP-B-601 boxes (37-3/4 x 21 x 32) for the
arc chutes in accordance with appendix D-1. Refer
to table B-2-4 for list of materials.
(2) Wrap the arc chutes with PPP-C-843 cushioning.
(3) Place three arc chutes into the box.
(4) Isolate the arc chutes from the sides of the box and
each other by using MM-L-751 (21 x 2 x 4) lumber and
seal the box.
e.
Packing for the Control Unit.
(1) Fabricate a MIL-C-104 crate (252-1/2 x 81 x 93-1/2)
in accordance with appendix D-3. Refer to table
Change 1