TM 43-0156
Step
Function
Mech
Insp
2
f.
Batteries and Cables.
cont
NOTE
The batteries are on both
sides of the engine under
the decking on the electric
start generator set. The
batteries for the air start
generator set are on one
side only.
(1)
Coat the battery cable connectors with MIL-S-8660
silicone. Wrap with MIL-B-121 barrier and secure
with PPP-T-60 tape. Secure these ends to prevent
movement.
(2)
Moisture seal the filler openings of the batteries
in such a manner that the batteries cannot be
activated without destroying the seals.
(3)
Place 10 dry-charged batteries into battery rack.
(4)
Install Jumper cables.
(5)
Coat battery connections with MIL-S-8660 silicone.
g.
Electrolyte.
NOTE
Air start system requires
25 gallons of electrolyte.
The electric start system
requires 50 gallons of electrolyte.
(1)
Fabricate a PPP-B-601 box (56 x 29-3/4 x 21-1/2) in
accordance with appendix D-1. Refer to table B-1-2
for list of materials.
(2)
Fill bottom of box with 3 inches of HH-I-585 thermal
insulation.
(3)
Place the five, 5-gallon containers of electrolyte,
spaced 3 inches between each container on top of the
insulation.
(4)
Fill void with HH-I-585 thermal insulation to the
level of the top edge of the wooden box.
B-1-10