Click here to make tpub.com your Home Page

Page Title: LAYAWAY IN PLACE TO LEVEL " " FOR (3) 3000 lb. DRILLS.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 38-260
EXAMPLE 2 LAYAWAY IN PLACE TO LEVEL " " FOR (3) 3000 lb. DRILLS.  ASSUMING A LABOR RATE OF
A
20.00/HR, 2000.00 TOTAL TOOLING REPL COST FOR 3 DRILLS, AND 1000 MILES TO TRANSPORT.
3000 + 3000 + 3000 = 9000 lbs. total wt. (3) drills; 9000/4,000 = 2.25 round down 2 machines. Conversion to 3 ton class.
3 TON
LAYAWAY ACTIONS
(4000-8,000 lbs)
MAN HRS
MATERIAL
1. FLUSH
6
65.00
3. CLEAN EXTERIOR
4
18.00
4. DISASSEM-CLEAN-REASSM
42
38.00
5. PRESERVE LEVEL'A'
8
65.00
13. SHROUD
3
21.00
15. RECORDS & OFFICE
4
18.00
16. INCIDENTALS/MISC
4
13.00
71
238.00
71 M/H X 20.00/HR Labor
= 1420.00
Material cost
= 238.00
TRSPN
1.02 X 1000 Mi
= 1020.00
Tooling
.06 X 2000
= 120.00
= 1658.00 X 2 (4 Ton Equiv. Mach)
= 3316.00
ESTIMATED PCH&T FOR (3) 3000 lb. DRILLS
= 4456.00
B-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business