|
|
TM 32-6110-003-24&P
SECTION V. GENERAL SUPPORT TEST PROCEDURE
5-13. General. This section provides the test procedure to determine whether the performance of the repaired
power distribution box is satisfactory for return to the user.
5-14. Test. Perform all the steps in table 5-4 to verify operation of the power distribution box. Perform each
step in the sequence listed.
5-39/(5-40 blank)
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |