Quantcast Installation cont'd - TM-9-2320-360-20-20530 2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation cont'd
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation - TM-9-2320-360-20-20529
Up
TM-9-2320-360-20-2 Truck Tractor M1070 8x8 Heavy Equipment Transporter (HET) NSN
Next
Adjustment - TM-9-2320-360-20-20531
TM 9-2320-360-20-2
8-5. SHIFT CABLE ADJUSTMENT/REPLACEMENT (CONT)
(8) Connect 6-pin plug (14) to electrical
receptacle (15).
CAUTION
U-bolt must be located in notch on
cable. Failure to comply may result
in damage to equipment.
(9) Position U-bolt (16) and bracket (17)
around shift cable (2).
(10) Install shift cable (2) on bracket (18) with
bracket  (17),  U-bolt  (16),  two  new
lockwashers (19), and nuts (20).
(11) Screw yoke (21) on shift cable (2).
NOTE
Do  steps  (12)  thru  (14)
only
if
adjustment is not required.
(12) Tighten jamnut (22) on yoke (21).
(13) Install clevis pin (23) in yoke (21).
(14) Install new cotter pin (24) in clevis pin
(23).
8-12 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.