| 
 | ||||||||||
| 
 |  TM 9-2320-269-34-1 POWER DIVIDER LOCKOUT ASSEMBLY This task covers: a. Removal (page 2-898) d. Inspection/Replacement (page 2-901) b. Disassembly (page 2-899) e. Assembly (page 2-902) c. Cleaning (page 2-900) f. Installation (page 2-904) INITIAL SETUP Personnel Required Tools Driftpin, brass, 1/2-inch One Face, hammer, inserted, medium-plastic Equipment Condition Hammer, ball-peen, machinist's, 3-lb Hammer, plastic-face, medium Air reservoir drained (TM 9-2320-269-20-1) Handle, ratchet, 3/8-inch drive Holder, inserted hammer face Puller, slide hammer Screwdriver, flat-tip, 1/4-inch Scribe, machinist's Socket, 3/8-inch drive, 7/16-inch Socket, 3/8-inch drive, 9/16-inch Socket, deep well, 3/8-inch drive, 9/16-inch Wrench, open-end, 9/16-inch Wrench, open-end, 7/8-inch Materials/Parts Gasket, shift fork housing Felt strip, piston (two required) Filter, shift cylinder body Lockwasher, hose clip Lockwasher, shift cylinder cover (four required) Packing, preformed, piston Packing, preformed, shift fork body Packing, preformed, shift fork shaft Packing, preformed, shift cylinder cover Rags, wiping (item 42, appendix B) Seal, oil, shift fork housing (as needed) Solvent, drycleaning (item 49, appendix B) 2-897 | 
| Privacy Statement - Press Release - Copyright Information. - Contact Us |