Click here to make tpub.com your Home Page

Page Title: Section IV. Remarks
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-1270-219-13&P
Section
IV.
REMARKS
Ref. Code
Remarks
A
Test is performed using built-in-test (BIT) to determine system operation by checking each LRU.
B
There are no special service actions, however, a pressure check is required after either the EPU or AADS is
repIaced.
The air data LRUs do not require boresight alignment. The probe mount will be aligned during system boresight
C
D
The subsystem is repaired by replacement of LRUs found defective during BIT operation.
E
Air data probe does not require intermediate maintenance, however, the probe failure will be verified by AVIM
before unserviceable unit is returned to depot.
F
System Level.
G
LRU Level.
H
SRU Level.
I
The chassis assembly is not field separable but will be examined by depot maintenance to determine
serviceability.
J
To be agreed with BHT.
K
Repair of LRUs at AVIM level is limited to replacement of SRUs in the EPU only, and the Sensor Installation
is also repairable at AVIM. The AADS and LAI LRUs are non-repairable at AVIM. Failure of these units will
be verified at AVIM before unserviceable unit is returned to depot.
L
Refer to T M
for
description
and
use
of
failure
isolation
shop
set
(FISS).
9-4933-270-30
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business