|
|
TM
9-2350-238-20-2
Install reciprocating pump (1), two new Iockwashers (2), and two hexagon head capscrews
1
(3).
2
Install
hydraulic
hand
pump
shouldered
shaft
(4)
and
spring
pin
(5)
on
reciprocating
pump
(1).
If
removed,
install
new
hand
pump
handle
grip
(6)
on
hydraulic
hand
pump
shouldered
shaft
3
(4).
4
Install
hydraulic
hand
pump
webbing
strap
(7)
on
hydraulic
hand
pump
shouldered
shaft
(4).
Install
new
preformed
packing
(8),
flat
washer
(9),
new
tube
fitting
locknut
(10),
and
tube
5
tee
(11)
on
flow
divider
hydraulic
manifold
(12).
6
Install
new
preformed
packing
(13)
and
tube
reducer
(14).
7
Connect
hand
pump
pressure
metal
tube
assembly
(15)
to
tube
tee
(11)
and
tube
reducer
(14).
Install new preformed packing (16) and tube nipple (17).
8
Install new preformed packing (18) and tube nipple (19) on flow divider hydraulic manifold
9
(12).
10
tube assembly (20) to two tube nipples (17 and 19).
Connect
hand
pump
suction
metal
Install new preformed packing (21), new packing retainer (22), new tube fitting locknut
11
(23),
and
tube
elbow
(24)
on
flow
divider
hydraulic
manifold
(12).
12
Connect
hull
return
nonmetallic
hose
assembly
(25)
to
tube
elbow
(24)
and
slip
ring
(26).
2-221
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |