Click here to make tpub.com your Home Page

Page Title: REMOVAL (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
NOTE
Remove tube reducer (17) and preformed
8
packing
(18).
Gain  access  to  traversing  system
solenoid  valves  hydraulic  lines  and
fittings  through  well.
The
vehicle
hydraulic
system
is
of
Make sure MASTER switch is OFF
the open center type and has
before  removing  electrical  leads.
Failure  to  observe  this  warning  could
pressure only when the hydraulic
result in injury to personnel.
pumps are operating.
Two level wind traverse directional
Tag
and
disconnect
two
electrical
leads
9
control  solenoid  valves  are
(19)  from  two  level  wind  traverse  direc-
mounted on left turret wall.
tional  control  solenoid  valves  (2  and  11).
(20), six
Remove
six
hexagon
capscrews
Disconnect traverse motor control line
10
1
Iockwashers (21), and two level wind
tube  assembly  (1)  from  level  wind  traverse
traverse  directional  control  solenoid
directional  control  solenoid  valve  (2).
valves (2 and 11).
2
Disconnect solenoid valve motor control
11
Back  off  tube  fitting  locknut  (22)  on  tube
metal  tube  assembly  (3)  from  level  wind
to boss tee (15) and remove level wind
traverse  directional  control  solenoid  valve
(2).
traverse
directional
control
solenoid
valve
(2).
Remove
external
thread
tube
reducer
(4),
3
Remove tube to boss tee (15), preformed
12
preformed packing (5), tube elbow (6),
tube  fitting  locknut  (7),  flat  washer  (8),
packing  (23),  tube  nipple  (24),  tube  fit-
ting  locknut  (25),  flat  washer  (26),  and
and preformed packing (9) from level wind
preformed
packing
(27).
traverse
directional
control
solenoid
valve
(2).
13
Remove
preformed
packing
(28),
flat
Disconnect solenoid valve to motor input
washer (29), and tube fitting locknut
4
metal tube assembly (10) from level wind
(22) from tube to boss tee (15).
traverse
directional
control
solenoid
valve
Disconnect level wind solenoid valve
(11).
14
pressure line to tee metal tube assembly
Remove tube reducer (12) and preformed
(30) and tube assembly (31) from tube
5
tee (32).
packing  (13).
Remove
tube
tee
(32),
tube
fitting
15
Disconnect level wind solenoid valve input
6
locknut  (33),  packing  retainer
(34),
and
pressure
line
nonmetallic
hose
assembly
preformed  packing  (35).
(14) from tube to boss tee (15).
Disconnect traverse motor control line
7
metal tube assembly (16) from level wind
traverse
directional
control
solenoid
valve
(11).
2-203

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business