Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM
9-2350-238-20-2
NOTE
There may be  shims  between  the
b o o m  e y e s and cylinder eyes. If
reinstalling old shims, they must be
retained
in the same position.
4 Using hammer and drift, install two upper
hinge  headless  straight  pins  (6).
5 Install  lubrication  fitting  (7)
to
upper
hinge
headless  straight  pin  (6).
6 Install  two  nut  and  pin  boom  hinge  pin
locking  plates  (8),  two  new  Iockwashers
(9),  and  two  hexagon  capscrews  (10)
securing two upper hinge headless
straight
pins
(6).
7 Remove sling from hoist. Remove sling
from crane boom (1).
Make sure MASTER switch is OFF
before  repairing  electrical  circuits.
Failure  to  observe  this  warning  could
result in injury to personnel.
8 Connect
boom
floodlight
electrical
lead
(11).
2-165

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business