Click here to make tpub.com your Home Page

Page Title: INSTALLATION (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2350-238-20-1
2-196. MAINTENANCE OF CRANE OPERATOR'S ENCLOSURE KIT (CONT).
INSTALLATION (CONT)
Position crane operator's base assembly
9
(7) on cupola (16) with notched section
towards rear.
NOTE
Use hull brackets as a template for
locating and drilling holes for four
crane operator's base assembly
mounting screws.
Using drill cutting fluid, drill four 7/32-in.
10
(5.56-mm) holes through cupola (16). Tap
holes to 0.250-28 UNF-2B.
Insert wiper motor and defroster lead
11
disconnect branched wiring harness (17)
through notch in crane operator's base
assembly (7), and lower crane operator's
base assembly onto cupola (16).
Install wiper motor and defroster lead
12
disconnect branched wiring harness (17),
lockwasher (18), and hexagon head
capscrew (19) on hull bracket (20).
Install three lockwashers (21), and three
13
hexagon head capscrews (22), in three
hull brackets (23). Torque four hexagon
head capscrews to 90.00 5.00 in.-lb
(10.17 0.56 N-m).
Apply sealant (item 35, appx C) to seal
14
area between wiper motor and defroster
lead disconnect branched wiring harness
(17) and notch in crane operator's base
assembly (7).
2-1114

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business