Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2350-238-20-1
4 For repair of electrical leads and wiring harnesses, refer to page 2-371.
5 For repair of shell connectors, refer to general maintenance, page 2-371.
6 Repair is by replacement of authorized parts (TM 9-2350-238-24P-1).
1
Install pyrometer panel assembly (1).
Secure pyrometer panel assembly and
ground lead (2) with two screws (3), two
new Iockwashers (4), and two nuts (5).
2
Install nonmetallic grommet (6) and
pyrometer panel assembly to thermo-
couple assembly electrical lead (7) in
pyrometer lead retaining plate (8).
Install pyrometer lead retaining plate (8)
3
and loop clamp (9), and secure with two
hexagon head capscrews (10), two new
Iockwashers (11), and two hexagon plain
nuts (12).
4
Install thermocouple assembly (13).
Untag and connect electrical leads to
thermocouple assembly.
2-1033

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business