|
|
TM 9-2350-238-20-1
2-175. MAINTENANCE OF HEATER INSTALLATION KIT--BATTERY BOX AND
COVERS.
a. Removal
b. Inspection/Repair
This task covers:
c. Installation
INITIAL SETUP
General Safety Instructions
Materials/Parts
Cotter pin (4)
References
TM 9-2350-238-24P-1
Disconnect ground leads first and
connect ground leads last when
removing or installing electrical leads.
Equipment Conditions
Master switch in OFF position
1
Remove battery insulation pad (1) .
Disconnect both ground leads first
when removing electrical leads from
batteries.
2
Remove ten hexagon plain nuts (2), ten
flat washers (3), two battery holddown
plates (4), and three battery retaining
plates (5).
Remove four cotter pins (6), four flat
3
washers (7), four headed straight pins (8),
and four battery holddown rod end
connectors (9) from battery box (10).
Remove batteries. Refer to page 2-840.
4
Remove three plate assembly anchors
5
(11) from battery box (10).
Remove eight hexagon head capscrews
6
(12), eight flat washers (13), and battery
heating pad (14) from battery box (10).
Remove battery box (10) from vehicle.
7
2-1009
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |