|
|
TM 9-2350-238-20-1
62 Install new preformed packing (102),
56 Install new preformed packing (93),
packing retainer (103), new tube fitting
packing retainer (94), new tube fitting
locknut (104), and tube elbow (105) to port
locknut (95), and tube elbow (96) to port 2
1 of right hydraulic cylinder assembly (97).
of right hydraulic cylinder assembly (97).
63 Tighten tube fitting locknut (104).
57 Tighten tube fitting locknut (95).
64 Install nonmetallic hose assembly (106) on
58 Install nonmetallic hose assembly (98) to
tube elbow (105).
tube elbow (96).
65 Install elbow (107) on nonmetallic hose
59 Install elbow (99) on nonmetallic hose
assembly (106).
assembly (98).
66 Install new preformed packing (108) and
60 Install new preformed packing (100) and
new tube fitting locknut (109) to elbow
new tube fitting locknut (101) on elbow
(107).
(99).
67 Connect metal tube assembly (89) to
61 Connect metal tube assembly (88) to
elbow (107).
elbow (99).
2-991
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |