|
|
TM 9-2350-238-20-1
1 Install tube assembly (1) on valve (2).
2 Install tube reducer (3) on tube assembly (1).
Install tube assembly (4) on tube reducer (3).
3
4
Install new tube fitting locknut (5) on tube nipple (6).
5
Install tube nipple (6) with tube fitting locknut (5) on bulkhead.
6
Connect tube assembly (4) to tube nipple (6).
7
Install tube assembly (7) on tube nipple (6).
8
Tighten tube fitting locknut (5) on tube nipple (6).
9
Connect tube assembly (7) to tube nipple (8).
10
Install tube assembly (9) on tube nipple (10).
11
Install loop clamp (11), new Iockwasher (12), and capscrew (13) on tube assembly (9).
12
Install tube nipple (14) on tube assembly (9).
13
Install tube assembly (15) on tube nipple (14).
14
Install new preformed packing (16) and tube reducer (17) on flange (18).
15
Install loop clamp (19), new Iockwasher (20), and capscrew (21) on tube assembly (15).
16
Connect tube assembly (15) to tube reducer (17).
Install new tube fitting locknut (22), flat washer (23), and new preformed packing (24) on tube
17
elbow (25).
18
Install tube elbow (25) with attached parts on lockout cylinder (26).
19
Tighten tube fitting locknut (22) on tube elbow (25).
20 Install hose assembly (27) on tube elbow (25).
2-913
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |