|
|
TM 9-2350-238-20-1
23
Install new locknut (25) on tee (26).
24
Install tee (26) with new locknut (25) on hull bracket.
25
Connect tube assembly (10) to tee (26).
26
Tighten locknut (25) on tee (26).
27
Install tube assembly (27) on tee (26).
Install new preformed packing (28) on tube reducer (29).
28
Install tube reducer (29) with new preformed packing (28) on tee (26).
29
30
Connect nonmetallic hose assembly (24) to tube reducer (29).
Install loop clamp (30), new Iockwasher (31), and screw (32) on tube assembly (27).
31
Install new locknut (33) on lockout switch tee (34).
32
Install lockout switch tee (34) with new locknut (33) on hull bracket.
33
Install tube cap (35) on lockout switch tee (34).
34
Tighten locknut (33) on lockout switch tee (34).
35
36
Connect tube assembly (27) to lockout switch tee (34).
Install tube assembly (36) on lockout switch tee (34).
37
Install loop clamp (37), Iockwasher (38), and screw (39) on tube assembly (36).
38
Install new preformed packing (40) on tube nipple (41).
39
Install tube nipple (41) with new preformed packing (40) on lockout cylinder (42).
40
Install nonmetallic hose assembly (43) on tube nipple (41).
41
Install new locknut (44) on lockout cylinder tee (45).
42
43
Install lockout cylinder tee (45) with new locknut (44) on hull bracket.
44
Connect nonmetallic hose assembly (43) to lockout cylinder tee (45).
45
Tighten locknut (44) on lockout cylinder tee (45).
46
Connect tube assembly (36) to lockout cylinder tee (45).
Install tube assembly (46) on lockout cylinder tee (45).
47
2-903
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |