Click here to make tpub.com your Home Page

Page Title: REASSEMBLY/lNSTALLATION (CONT)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2350-238-20-1
17
Install two threaded straight pins in
opposing capscrew holes on hull.
18
Coat sealing surfaces of roadwheel pivot
arm assembly (9) and hull with sealing
compound.
19
Position roadwheel pivot arm assembly (9)
on threaded straight pins.
Push roadwheel pivot arm assembly (9)
20
into hull until end of spindle is visible in
road wheel lever cavity.
Insert and position roadwheel lever (22)
21
into road wheel lever cavity.
Position roadwheel lever (22) so blind
22
spline on lever arm mates with blind spline
on roadwheel arm spindle.
Remove two threaded straight pins.
23
Install and tighten six hexagon head
24
capscrews (23) and six new Iockwashers
(24) in cross-pattern sequence.
Install eye of lockout cylinder assembly
25
(25) into arm of roadwheel lever (22).
26
Install straight headless pin (26) and two
new cotter pins (27).
27
Lubricate roadwheel and hub assembly.
Refer to TM 9-2350-238-10.
2-841

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business