|
|
TM 9-2350-238-20-1
NOTE
q There are two blower to ground electrical leads. The following steps are written for
one electrical lead, but apply to both.
To remove the forward blower to ground electrical lead, the air cleaner blower
q
motor access door must be open.
To remove the aft blower to ground electrical lead, the air cleaner blower access
q
cover must be removed (page 2-918).
1 Wiring harnesses and leads are secured to the hull and components with loop clamps, straps,
clips, ground screws, etc. Remove only the hardware which secures the wiring harness or lead
being removed.
2 Disconnect cable terminal (1) from air cleaner centrifugal fan.
3 Disconnect shell connector (2) from air cleaner centrifugal fan.
4 Remove blower to ground electrical lead (3) from hull.
INSPECTION/REPAIR
1 Inspect for broken, damaged, or missing parts.
2 If damaged or missing, replace marker bands. Etch or stamp lead number on new band.
5 Repair is by replacement of authorized parts (TM 9-2350-238-24P-1).
INSTALLATION
NOTE
There are two blower to ground electrical leads. The following steps are written for
one electrical lead but apply to both.
Install blower to ground electrical lead (3) in hull.
Connect shell connector (2) to air cleaner centrifugal fan.
Connect cable terminal (1) to air cleaner centrifugal fan.
Wiring harnesses and leads are secured to the hull and components with loop clamps, straps,
clips, ground screws, etc. During installation, make sure the wiring harness or lead is secure
and all hardware is tight.
2-691
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |