|
|
TM 9-2350-238-20-1
1 Install bulkhead disconnect to engine components and warning units branched wiring harness
(1) on powerplant.
2 Untag and connect shell connector (2) to engine oil pressure sending unit.
3 Untag and connect shell connector (3) to engine low oil pressure warning switch.
4 Untag and connect shell connector (4) to engine water temperature warning switch.
5 Untag and connect shell connector (5) to engine water temperature sending unit.
6 Untag and connect plug connector (6) to air box heater bracket receptacle connector.
7 Untag and connect shell connector (7) to line connection.
9 Install ground cable terminal (9) and screw (10) on bulkhead.
10 Untag and connect shell connector (11) to transmission oil high temperature warning switch.
11 Untag and connect shell connector (12) to transmission oil temperature sending unit (13).
12 Untag and connect shell connector (14) to transmission oil pressure sending unit.
13 Wiring harnesses and leads are secured to the hull and components with loop clamps, straps,
clips, ground screws, etc. During installation, make sure the wiring harness or lead is secure
and all hardware is tight.
2-651
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |