| 
 | ||||||||||
| 
 |  TM 9-2350-238-20-1 2-77. MAINTENANCE OF MISCELLANEOUS ELECTRICAL COMPONENTS (CONT). INSTALLATION 1 Position two air box heater circuit breakers (1) at top of driver's compartment, and secure with four new Iockwashers (2) and four socket head capscrews (3). 2 Untag and connect electrical leads to two air box heater circuit breakers (1). breaker (4) in left front engine/driver's bulkhead side, and secure with two new lockwashers (5) and two socket head capscrews (6). 4 Untag and connect electrical leads to generator cooling fan circuit breaker (4). 2-588 | 
| Privacy Statement - Press Release - Copyright Information. - Contact Us |