Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2350-238-20-1
1 If removed, apply adhesive to four new radiator bulkhead seals (1) and four new radiator
bulkhead rubber strips (2) and install.
2 Install two filler opening caps (3).
3 Install two new radiator tube assembly gaskets (4), radiator surge tank metal tube assembly (5),
and radiator pressure equalizing metallic tube (6), and secure with eight new packings with
retainers (7) and eight hexagon head capscrews (8). Torque hexagon head capscrews to 1.2 to
1.5 ft-lb (1.6 to 2.0 N-m).
4 Install two drain cocks (9).
5 Install two radiator base resilient mounts (10) and secure with six machine bolts (11), six new
Iockwashers (12), and six hexagon plain nuts (13). Torque hexagon plain nuts to 17 to 19 ft-lb
(23 to 26 N-m).
2-521

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business