Click here to make tpub.com your Home Page

Page Title: Installation (Cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2350-238-20-1
Install throttle linkage bell crank (17) and headless straight pin (18). Install two new cotter pins
7
(19) in headless straight pin.
Install hexagon head capscrew (20), new Iockwasher (21), and hexagon plain nut (22).
8
Install throttle linkage plain stud (23), hexagon plain nut (24), and rod end plain bearing (25).
9
10
Install hexagon head capscrew (26), new Iockwasher (27), and hexagon plain nut (28).
Install hexagon plain nut (29) and rod end plain bearing (30) on throttle linkage plain stud (23).
11
12
Install hexagon head capscrew (31), new Iockwasher (32), and hexagon plain nut (33).
Install transmission throttle control lever (34).
13
Install threaded end rod (35), flat washer (36), helical spring (37), and flat washer (38) on
14
transmission throttle control lever (34). Install two new cotter pins (39).
Install hexagon plain nut (40) and rod end plain bearing (41). Tighten hexagon plain nut.
15
16
Install rod assembly (42). Install hexagon head capscrew (43), new Iockwasher (44), and
hexagon plain nut (45) on transmission and governor linkage bell crank (1).
2-505

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business