Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2350-238-20-1
2-35. MAINTENANCE OF POWERPLANT (CONT).
NOTE
Step 1 applies to the installation of
the power takeoff drive shaft. Per-
form step 1 only if necessary to repair
the power takeoff drive shaft.
Install power takeoff drive shaft (1), four
1
hexagon head capscrews (2), and new
Iockwire (3) (item 26, appx C) on auxiliary
drive assembly (4).
Install cushioning pad (5) and spacer tube
2
(6) to hull bottom.
NOTE
Step 3 is written for installation of left
alignment ring, but also applies to
right alignment ring.
3 Install left alignment ring (7) in slot (8) in
final drive housing.
4
Install four new preformed packings (9) on
2-402

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business