|
|
TM 9-2350-238-20-1
2-35. MAINTENANCE OF POWERPLANT (CONT).
NOTE
Step 1 applies to the installation of
the power takeoff drive shaft. Per-
form step 1 only if necessary to repair
the power takeoff drive shaft.
Install power takeoff drive shaft (1), four
1
hexagon head capscrews (2), and new
Iockwire (3) (item 26, appx C) on auxiliary
drive assembly (4).
Install cushioning pad (5) and spacer tube
2
(6) to hull bottom.
NOTE
Step 3 is written for installation of left
alignment ring, but also applies to
right alignment ring.
3 Install left alignment ring (7) in slot (8) in
final drive housing.
4
Install four new preformed packings (9) on
powerplant (10).
2-402
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |