|
|
TM 9-2350-238-20-1
2-35. MAINTENANCE OF POWERPLANT (CONT).
REMOVAL (CONT)
Hoist powerplant sling over powerplant
(133), and position two longest cables
(134) toward front of vehicle. Attach
powerplant lifting sling to powerplant at
five lifting eyes. Slowly lift powerplant
sling and adjust turnbuckles until all cables
are taut and carrying about equal weight.
Keep top beam (135) level. Continue
lifting while watching all sides of
powerplant to ensure that it clears all
components and hull structure. Lower
powerplant and place on stand or blocks.
39 Remove four preformed packings (136)
from powerplant (133).
2-398
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |