Click here to make tpub.com your Home Page

Page Title: Stowage of Swingfire Heater and Mixing Pipe
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-386-10
2-48. OPERATION OF SWINGFIRE HEATER (Contd)
(5) Allow swingfire heater (5) to run until temperature gauge reads 190F (88C).
(6) When temperature gauge reads 190C (88C), loosen wingnut (9) by turn-
ing counterclockwise and remove swingfire heater (5). Start engine (para. 2-12).
(7) Install cap (11) on end of water jacket (10).
(8) Install swingfire heater (5) in mixing pipe (refer to task c.), turboheater
(refer to task e.), or stow (refer to task f.), as necessary.
10
5
5
8
9
11
f.
Stowage of Swingfire Heater and Mixing Pipe.
(1) General. Swingfire heater and mixing pipe are stowed under companion seat.
(2) Shut off swingfire heater (5) (refer to task b.).
WARNING
Mixing pipe will become hot after continued operation. Do not
remove mixing pipe until cool. Failure to do so may result in injury
to personnel.
(3) Position mixing pipe (12) on stowage brackets (17). Place straps (18) over
mixing pipe (12) and install latches (16) on stowage brackets (17).
(4) Position swingfire heater (5) on stowage brackets (15). Place strap (13)
over swingfire heater (5) and install hook (14) on stowage bracket (15).
12
13
18
5
17
14
16
15
2-117 (2-118 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business