TM 9-2320-386-10
Table 2-2. Operator/Crew Preventive Maintenance Checks and Services (Contd).
ITEM TO
NOT FULLY
ITEM
INTERVAL
CHECK/
PROCEDURE
MISSION
NO.
SERVICE
CAPABLE IF:
53
Weekly
A-frame
Check cable, clamps, and A-frame for
A-frame kit is
(Contd)
kit
security of mounting and condition
required for the
(if installed).
mission and it is not
mounted or is bent,
cable is frayed or
broken, or clamps are
loose.
54
Winteriza-
Check operation and condition of:
tion kits
a. Swingfire heater, if installed
a. Heater is non-
operational and
temperature range
requires use.
b. Fuel burning personnel heater,
b. Any leakage
if installed (para. 2-48).
of fuel.
c. Power plant heater, if installed
c. Any leakage
of fuel.
d. Radiator cover and thermal barrier,
if installed (para. 2-48).
e. Any leakage
e. Cargo body arctic kit, if installed
of fuel.
55
Bow and
a. Check bows (4) for cracks and
tarpaulin
breaks.
kit
b. Check tarpaulin straps (2) for
security. Tighten if necessary.
c. Check tarpaulin (3) for rips,
tears, or punctures.
d. Check for loose or broken
tiedowns (1) and lacing.
1
2-46
Change 1
|