2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
Section II. MAINTENANCE ALLOCATION CHART
FOR THE HET TRACTOR (CONT)
(1)
(2)
(3)
(4)
(5)
(6)
MAINTENANCE LEVELS
TOOLS
GROUP
MAINTENANCE
AND
DIRECT
GENERAL
NUMBER
COMPONENT/ASSEMBLY
FUNCTION
EQPT
REMARKS
UNIT
DEPOT
SUPPORT
SUPPORT
C
O
F
H
D
1103
Planetary and Hub
Inspect
0.1
Assembly
Service
0.4
6,11
Replace
2.5
1,11, 83,
90, 94,95,
96
1104
No. 4 Axle Pivot,
Repair
8.4
1,2, 10, 11,
Spindle, and Axle
87, 88, 89
Assembly
12
Brake System
1202
Brake Shoes
Replace
1.0
6,8,11,132
Repair
0.6
1,11
Brake Camshaft and
Service
0.1
6
Bracket
Repair
4.2
1, 11
1208
Brake Treadle Valve
Repair
2.0
2.5
1, 11
1209
Air Dryer
Inspect
0.1
Service
1.4
8,11
Repair
1.0
8,11
Coalescing Filter
Service
0.3
Repair
0.5
11
Aftercooler
Inspect
0.1
Service
1.4
8,11
Repair
1.0
8, 11
Air Compressor
Inspect
0.1
Replace
5.4
1,11,127
Repair
3.0
1, 3,11, 98,
129
13
Wheels and Tires
1311
Drum Assembly
Replace
2.0
6, 8,11,132
Repair
1.0
1, 11,147
CTI Controller Module
Replace
0.8
11
Repair
0.1
11
CTI Power Manifold
Replace
0.7
11,99
Repair
1.2
11
CTI Wheel Valve
Repair
0.5
6,11
1313
Tire
Service
0.2
Repair
*
6,11
A
B-10 Change 2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |