2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
19-7. ARCTIC KIT WIRE HARNESS REPLACEMENT (CONT)
(25) Remove locknut (75), clip (76), and screw
(77) from transmission oil filter bracket
(78). Discard locknut.
(26) Remove negative (-) cable (46) from
starter (52) to shunt (60) from HET
Tractor.
b. Installation
CAUTION
Make  sure  rubber  grommets  are
installed correctly in holes on side of
battery box to prevent cables from
shorting out on box.
NOTE
Do steps (1) thru (14) if starter
cables were removed.
It may be necessary to coat
rubber  grommets  and  battery
cables with lubricant to aid with
installation.
(1) Insert  negative  battery  (-)
cable
(1)
through rubber grommet (2).
(2) Insert  positive  (+)  battery
cable
(3)
through rubber grommet (4).
19-32 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business