2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
(12) Install jumper cable (24) on battery posts
(25 and 26).
(13) Tighten two nuts (27) on jumper cable
(24).  Torque to 84-96 lb-in. (9.4-10.8
Nm).
(14) Lightly coat battery posts (25 and 26) with
grease.
(15) Insert negative (-) cable (28) through
rubber grommet (4).
(16) Insert wire no. 1435 (29) and wire no.
1373 (30) through rubber grommet (4).
(17) Insert positive (+) cable (31) through
rubber grommet (4).
(18) Install wire no. 1435 (29), wire no. 1373
(30), and negative (-) cable (28) through
lower hole (33) in battery box (5).
(19) Install positive (+) cable (31) through
upper hole (34) in battery box (5).
(20) Install wire no. 1435 (29) and negative (-)
cable (28) to cable clamp (35) with screw
(36), washer (37), new lockwasher (38),
and nut (39).  Torque to 144-192 lb-in.
(16.1-21.5 Nm).
(21) Install wire no. 1373 (30) and positive (+)
cable (31) to cable clamp (40) with screw
(41), washer (42), new lockwasher (43),
and nut (44).  Torque to 144-192 lb-in.
(16.1-21.5 Nm).
c. Follow-On Maintenance
(1) Connect arctic kit batteries (para 19-2).
(2) Start engine (TM 9-2320-360-10).
(3) Check
battery
operation
(TM
9-2320-360-10).
(4) Shut off engine (TM 9-2320-360-10).
Change 1 19-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business