2320-01-318-9902 EIC:B5C, VOLUME NO. 2">
|
|
TM 9-2320-360-20-2
17-13. AUXILIARY WINCH REPLACEMENT
This task covers:
a. Removal
c.
Follow-On Maintenance
b. Installation
INITIAL SETUP
Equipment Conditions
Materials/Parts
Auxiliary winch cable removed (para 17-14).
Tags, Identification (Item 32, Appendix C)
Rear control console panel removed
Lockwashers (4) (Item 102, Appendix G)
Packings, Preformed (2) (Item 139, Appendix G)
Tools and Special Tools
Personnel Required
Tool Kit, Genl Mech (Item 54, Appendix F)
Two
Pan, Oil Drain (Item 26, Appendix F)
a. Removal
(1) Place drain pan under auxiliary winch (1).
NOTE
Tag and mark hoses before removal.
(2) Remove two hoses (2) from auxiliary
winch (1).
WARNING
Auxiliary
winch
weighs
approximately 130 lb (59 kg). Use
lifting device to remove auxiliary
winch. Failure to comply may result
In Injury to personnel.
(3) Attach lifting device to auxiliary winch (1).
(4) Remove four screws (3) and lockwashers
(4) from underside of frame assembly (5).
Discard lockwashers.
(5) Remove auxiliary winch (1) from frame
assembly (5) while assistant operates
lifting device.
(6) Remove lifting device from auxiliary winch
(1).
17-36
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |