2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Inspection
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
17-8. CONTROL CONSOLE PANELS/PERSONNEL GUARD REPLACEMENT (CONT)
c. Inspection
Inspect threaded inserts for damaged threads.
d. Control Console Panels Installation
(1) Install rear console panel (1) on control
console (2) with six screws (3). Torque to
20 lb-ft (27 Nm).
(2) Install front console panel (4) on control
console (2) with six screws (5). Torque to
20 lb-ft (27 Nm).
e. Personnel Guard Installation
Install personnel guard (1) on control console (2)
with two screws (3), washers (4), new lockwashers
(5), and nuts (6).
f. Follow-On Maintenance
(1) Lower personnel guard.
(2) Remove wheel chocks.
17-16 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business