2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Cab Insulation Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
f. Cab Insulation Installation
WARNING
Adhesive causes immediate bonding
on  contact  with  eyes,  skin,  or
clothing and also gives off harmful
vapors. Wear protective goggles and
use  in  well-ventilated  area.
If
adhesive gets in eyes, try to keep
eyes open, flush with water for 15
minutes and get immediate medical
attention.
NOTE
Cab must be clean and dry before
applying adhesive.
Do step (1) for insulation located
on interior cab walls, ceiling,
glove box, doghouse exterior and
doghouse storage area.
Do step (2) for insulation located
on
cab
underside,
exterior
firewall,  and  passenger  side
interior firewall.
Do step (3) for insulation panel
located on doghouse door.
(1) Apply bead of insulation adhesive (Item
2.1, Appendix C) to insulation panel (1).
NOTE
Adhesive applied in step (2) must be
allowed  to  dry  approximately  4
minutes before installing insulation
(2)  Apply  rubber/gasket  adhesive
(Item 22, Appendix C) to insulation
panel (1).
(3) Apply adhesive tape to edge of insulation
panel (1).
(4) Install insulation panel (1) on cab (2).
g. Follow-On Maintenance
Remove wheel chocks.
Change 2 16-139 (16-140 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business