2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
(20) Check inside door handle (14) operation.
NOTE
Do steps (20) thru (24) to adjust cable
if necessary.
(21) Remove cotter pin (25.2), pin (25.1) and
cable (4) from lock connecting lever (29).
(22) Loosen jam nut (23) and turn clevis end
(24) clockwise on cable (4) to shorten,
counterclockwise to lengthen.
(23) Tighten jam nut (23) and install clevis end
(24) on lock connecting lever (29) with pin
(25.1) and new cotter pin (25.2).
(24) Deleted.
(25) Check operation of inside door handle
(14).
Repeat steps (21) thru (24), if
necessary.
(26) Install spring (30) on door (2) and lock
connecting lever (29).
c. Follow-On Maintenance
Install inner door panel (para 16-26).
Change 1 16-107

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business