2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
13-8. TEE GEAR BOX REPLACEMENT (CONT)
WARNING
Support  tee  gear  box  before
Installing
mounting
screws
to
prevent Injury.
CAUTION
Tee box must be installed so that
input shaft and rear output shaft turn
in same direction.  Failure to do so
will  result  in  reverse  steering
response.
(3) Install four new lockwashers (12) and
screws (13) through mount (7) and tee
box (14) while assistant supports tee box
(14). Torque to 30 lb-ft (41 Nm).
(4) Rotate rear output shaft (5) to align key (2)
with slot (15) in rear steering shaft yoke
(16).
CAUTION
To install screws, holes in steering
shafts must align with grooves in tee
box shafts. Failure to install screws
through  grooves  may  result  in
steering
shafts
disconnecting,
causing damage to equipment.
(5) Install rear steering yoke (16) on rear
output shaft (5) with screw (17) and new
locknut (18). Torque to 35-40 lb-ft (48-54
Nm).
(6) Align key slot (19) with key (1) in front
output shaft (4).
(7) Install front steering yoke (20) on rear
output shaft (4) with screw (21) and new
locknut (22). Torque to 35-40 lb-ft (48-54
Nm).
(8) Rotate top steering shaft yoke (23) to align
key slot (24) with key (3) in input shaft (6).
(9) Install top steering shaft yoke (23) on input
shaft (6) with screw (24) and new locknut
(25). Torque to 35-40 lb-ft (48-54 N m).
13-38

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business