2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Installation
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
NOTE
Lubricate shaft (LO 9-2320-360-12).
Align matchmarks on shaft and
steering gears.
Shaft must be
aligned for proper steering timing
(front and rear gears).
d. Installation
(1) Position steering shaft (1) between steering gear
(2) and tee box (3) with splined end of shaft
toward steering gear (2).
(2) Align keyway (4) on tee box (3) with slot on
steering shaft (1).
(3) Install yoke (5) on tee box (3) with screw (6) and
new locknut (7).  Torque to 35-45 lb-ft (48-54
Nm).
(4) Install yoke (8) on steering gear (2) with screw
(9) and new locknut (10). Torque to 35-45 lb-ft
(48-54 Nm).
e. Follow-On Maintenance
(1) Lubricate shaft (LO 9-2320-360-12).
(2) Start engine (TM 9-2320-360-10).
(3) Check operation of steering (TM 9-2320-360-
10).
(4) Shut off engine (TM 9-2320-360-10).
13-23

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business