2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
(6) Install valve (5) on no. 2 crossmember (7) with
two screws (8) and new locknuts (9).
(7) Install hose no. 2050 (10) and hose no. 20 (11)
on elbows (1).
(8) Install hose no. 2669 (12) on fitting (2).
NOTE
Position  plastic  cable  ties
in
locations marked during removal.
(9) Secure hose no. 2050 (10) and hose no. 26
(12) with plastic cable ties (13).
(10) Install hose no. 2686 (14) and hose no. 24 (15)
on elbows (4).
c. Follow-On Maintenance
(1) Start engine (TM 9-2320-360-10).
(2) Build up air pressure to 120-125 psi (827-862
kPa).
(3) Shut off engine (TM 9-2320-360-10 ).
(4) Check for leaks.
11-163

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business