2320-01-318-9902 EIC:B5C, VOLUME NO. 2">

 

Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-360-20-2
(10) Install hose no. 2993 (21) on elbow (22).
(11) Install hose no. 2002 (23) and hose no.
2996 (24) on two fittings (25 and 26).
(12) Install hose no. 2995 (28) on elbow (30).
(13) Install sound shield flap (31) and plate
(32) on bracket (33) with four screws (34)
and new locknuts (35).
e. Follow-On Maintenance
(1) Install stowage box (para 16-14).
(2) Start engine (TM 9-2320-360-10).
(3) Build up air pressure to 100 psi (689 kPa).
(4) Shut off engine (TM 9-2320-360-10).
(5) Check for leaks.
11-133

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business